Pipe Fabrication & Modular Skids
Oil & Gas Metering Skids
Three 12” Metering skids installed in South Central Ohio.
McGraw Kokosing fabricated and assembled Three 12” metering skids for an oil terminal in the South-Central U.S along a 56 mile oil pipeline.
The project involved the pipe and skid fabrication, pipe assembly and electrical installation of three pipeline metering skids with flow rates of 100,000 bbl/day. The fabrication requirements also included Non-Destructive Testing (100% X-ray) of all pipe welds and shop hydrostatic testing of all pipe spools. Fabrication and assembly was performed at the Monroe Pipe Fabrication facility and shipped to the customer for installation.